Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion

Product Details
Customization: Available
Certification: ISO9001, ISO 14001,ISO 18000,
Color: Black,Yellow
Still deciding? Get samples of US$ 5/Roll
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (13)
  • Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
  • Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
  • Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
  • Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
  • Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
  • Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
Find Similar Products
  • Overview
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Non-woven Butyl Tapes
Heat Resistance
Normal Temperature
Waterproof
Waterproof
Application
Plastic, Metal, Rubber, Wood, Glass
Adhesive
Rubber, Butyl Rubber Modify Asphalt
Base Material
PE Foam
Type
Pressure-Sensitive Tape
Width
50 mm to 800 mm
Length
10 M to 60 M
Thickness
0.8 mm to 2.0 mm
Accept
OEM/ODM
Usage
Anti Corrosion or Waterproof
Trademark
ASN
Origin
Jiangsu, China
HS Code
6807100000
Production Capacity
60000rolls/Mouth

Packaging & Delivery

Package Size
25.00cm * 20.00cm * 15.00cm
Package Gross Weight
0.800kg

Product Description

Huaian Construction New Material
                                                                                  -- The anti-corrosion materials expert at your side
 
<All products in this shop are manufacturer's supply, can take samples for free!>
Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
Description
                    

Polyethylene bituminous tape for protection of pipelines from Corrosion, Tapes for waterproofing of roofs, waterproofing of foundations, for basements and underground jobs, waterproofing of swimming pools.

Polyethylene bituminous tape Used for the anticorrosion protection of buried or immersed pipes and fittings.  Applied to weld joints, bends, bare pipe lengths and pipe fittings.

Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
Features 
1, this product is solvent-free environmental protection products, that is, the base band and styling glue do not contain any volatile solvents, safe, fire and effectively protect the environment and the health of construction personnel.

2, the cold-wrapped tape substrate selection of polypropylene non-woven felt, the material is a new type of synthetic fiber with high mechanical strength and good corrosion resistance, and the surface does not contain wax, uniform thickness, so the surface of the anti-corrosion layer is flat, tight bonding, less pinholes, electrical properties and anti-corrosion properties are excellent.

3, the glue is solvent-free fast drying formula, the anti-corrosion layer curing speed is fast, and according to the season is divided into normal temperature type, low temperature type and ultra-low temperature type two, so it can be normal construction throughout the year, alleviating the winter construction problems.

4, the construction is convenient and fast, a wound can reach the China oil and gas industry standard SY/T 0447-96 requirements of the strengthening grade or extra strengthening grade anticorrosion layer required by the thickness and electric spark leak detection voltage, than the original use of epoxy coal tar paint and glass cloth combined into the same anticorrosion layer, convenient and fast.

5, the cold wrapping of epoxy coal asphalt makes the construction of epoxy coal asphalt anti-corrosion layer enter the factory pre-processing, effectively improve the construction quality and speed, and open up the scope of use for this kind of epoxy coal asphalt anti-corrosion layer with low price, long life and excellent anti-corrosion performance.

Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion

Properties

 

Physical Properties

 

Test Method

Typical Value

English

Metric

Total thickness

ASTM D 1000

50.0 mil

1.27 mm

Width 

-

2''- 32 ''

50 -800 mm

Length 

-

33' -200 '

10 -60 m

Backing colour

-

Black,Yellow or others

Tensile strength

ASTM D 1000

55 N/cm

Peel Adhesion to primed steel pipe

ASTM D 1000

35 N/cm

Elognation

ASTM D 1000

400%

Cathodic Disbandment

ASTM G8

0.25 in radius 6.4 mm

Dielectric Strength 

ASTM D 149

42 Kv

Volume Resistivity 

ASTM D 1000

1.2x1012 ohm.cm

Water Absorptivity

ASTM D 570

0.1 %

Water Vapor Transmission Rate (24h)

ASTM F1249

0.1g/100sq mm/24h

UV resistance

 

Excellent

Application Temperature                                                                        

 

23ºF-140ºF

-5 ºC - 60 ºC

Max Service Temperature

 

-4ºF-176ºF

- 20 ºC - 80ºC

Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion

Width: 50mm,75mm,100mm,150mm;can be customized!

Length: 5m,10m,20m;can be customized!

Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
Manufacture Factory Butyl Tapes Primer for Underground AnticorrosionManufacture Factory Butyl Tapes Primer for Underground Anticorrosion
1. Surface treatment. It is recommended to use shot blasting or sand blasting to remove rust at least GB/T 8923 Sa 2 level, it is recommended to reach Sa 2 1/2 level. When the construction conditions are limited, the rust can also be removed by hand or power tools to St 3 level. After the steel surface treatment is qualified, it must be painted as soon as possible before returning to rust. The surface of the concrete should be dry (surface water content is less than 6%), remove the loose material on the surface, and present a flat and solid surface.
2, with styling glue. Mix component A and B separately, and then mix thoroughly according to component A: Component B = 1:1 (weight ratio), and use immediately. The use of fast drying curing agent, curing speed is fast but the use period is short, so the summer must be used up within 1h, winter should be used up within 2h. Construction should be used now, so as not to cause solidification in the batching bucket, can not be used. When the ambient temperature is above 5 ° C during construction, normal temperature setting glue should be used (it should not be used below 5 ° C, because the curing time after coating is too long, affecting the construction progress), the ambient temperature is below 5 ° C, low temperature setting glue should be used (above 5 ° C can not be used, otherwise the curing speed is too fast, the good setting glue is easy to solidify in the barrel, can not be used, and the coating surface is prone to bubbles. Affect the quality).
3, weld putty. If the weld height is 2mm higher than the surface of the steel pipe and the special case of the lap of two steel plates, the two sides of the weld and the lap of the steel plate should be putty to form a smooth transition surface, and the pit on the concrete surface should also be putty to smooth. The putty is made of good styling glue and about twice the weight of talc powder, which should be used now, and used up within 2h after adjustment.
4. Glue and wrap. Before gluing, the steel surface must be dry, the amount of gluing is required to be sufficient, no leakage of coating, immediately after gluing, wrap the base band, the lap width of 10-20mm, must be pulled tight, so that the contact is tight, the surface is flat and no bulge, part of the adhesive liquid oozes from the surface of the tape (otherwise it indicates that the amount of gluing is insufficient), immediately after the wrapping on the tape and then evenly brush a layer of setting glue. After the end of work every day, we can use the diluent cleaning and brushing tools supplied by our company. After the diluent is used, the debris can be filtered out. It can be used again, but it must be kept closed.

Note: This product is divided into enhanced grades; Extra reinforcement grade; Three kinds of special intensification grade, in the choice of different levels of anti-corrosion requirements, the company is equipped with different adhesive and cold wrap. If you need to achieve the extra strengthening grade 0.8mm thick, you need to apply several sets of adhesive on the surface, instead of wrapping several cold tape, because 0.8mm thick cold tape can not penetrate the thick adhesive, so 0.8mm thick cold tape overlap must also be coated with adhesive.

(Note: Due to the low temperature, the consistency of the adhesive is relatively large, so it should be heated or used with diluent during construction, but if the diluent is added to reduce the solid content of the adhesive, it should be brushed several times or the thickness can not meet the requirements) The curing time of this product will depend on the length of the curing time when the temperature is low in winter, and the curing time is generally about 4 days in the case of zero degree.

5. Leak detection and repair. After the anti-corrosion layer is wrapped, let it dry itself, and keep it free from rain and water for at least 8h. After the anticorrosive layer is dried, the electric spark leak detector shall be used according to the leak detection voltage stipulated in China oil and gas industry standard SY/T 0447-96, that is: Use 2500V for the strengthening grade (0.4mm), 3000V for the extra strengthening grade (0.6mm), and 5000V for the extra strengthening grade (0.8mm) to check a small number of pinholes caused by uneven coating or missing coating, and mark the pinholes with chalk circles and apply the fixing glue as soon as possible. If it is required to use a higher leak detection voltage for the anti-corrosion layer, 1 to 2 layers of setting glue or epoxy coal asphalt topcoat can be applied after the anti-corrosion layer is dried.
6. Quality inspection. Inspection of appearance, thickness, leakage point and bonding force according to the conditions and methods specified in SY/T 0447-96.
Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
1, must use our company supplied baseband, styling glue (including A, B components).
2, the number of rubber in each box is only the normal amount of rubber/baseband/rubber standard structure construction.
3, transport should be light loading and unloading, the carton is placed, to prevent rain, avoid sunlight exposure.
4, storage should keep the original packaging, stored in a cool, dry, ventilated, near the fire source of the warehouse, up to 4 layers, storage period of half a year.
Company Profile

Huaian Construction New Material CO.,LTD is a supplier of structural reinforcement, leakage repair and Anticorrosion for industrial and industrial pipelines, and provides waterproof materials for swimming pools, floors and other buildings.Has 15 own patents and declares high-tech enterprises. And participates in many large foreign trade fairs every year. 
Manufacture Factory Butyl Tapes Primer for Underground AnticorrosionIt can provide real third-party inspection reports and maintain cooperation with many large engineering companies around the world.
 

Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion
Manufacture Factory Butyl Tapes Primer for Underground Anticorrosion

 

FAQ

1. Manufactureror Trading Company
We are manufacturer, located in Jiangsu ,China

2. Trade Term
FOB, CIP, CIF, C&F, EXW, FCA

 
3. Minimum Order
The minimum order is 3000 rolls.

 
4. Payment Terms
T/T (Telegraphic Transfer) , L/C at sight, Western Union

 
5. Estimated Time of Delivery
Based on order quantity:
Less than 5 tons, around 7-10 days.
5 - 10 tons, around 10-12 days
10- 20 tons, around 12 --15 days
More than 20 tons, depend on the agreement between two parties.

 
6. Free sample
The sample will be free , but the freight charge will be paid by buyer.

 
7. Logistics shipment
We can delivery the product by sea, truck, train, air, express delivery.

 
8. After-sales service.
1). Quality response
2). Providing technical proposal and field application training.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Product Groups
More