Huaian Construction New Material
-- The anti-corrosion materials expert at your side
<All products in this shop are manufacturer's supply, can take samples for free!>
Description
Polyethylene Bitumen Tape is a high-performance adhesive tape designed for a wide range of sealing and waterproofing applications. Made from a durable combination of polyethylene and bitumen, this tape provides excellent resistance to water, moisture, and extreme weather conditions, making it ideal for both indoor and outdoor use. Its self-adhesive backing ensures quick and easy installation without the need for additional adhesives or tools.
This tape is widely used in construction, roofing, and industrial applications, offering superior protection for sealing joints, pipes, roofs, and various surfaces. Whether it's for waterproofing, leak prevention, or insulating pipes, Polyethylene Bitumen Tape is an effective and reliable solution. Its flexibility and strength allow it to conform to irregular surfaces, providing a tight seal that lasts over time.
Key Features:
- Durable and Weather-Resistant: Withstands harsh environmental conditions, including UV exposure, rain, and extreme temperatures.
- Self-Adhesive: Easy to apply, no need for additional adhesives or equipment.
- Versatile: Suitable for roofing, plumbing, construction, and general waterproofing.
- Flexible: Conforms to irregular shapes, providing a tight and lasting seal.
- Long-Lasting Protection: Helps prevent leaks, moisture damage, and corrosion.
Whether you're working on a commercial roofing project, need to seal plumbing joints, or require a reliable material for insulation and waterproofing, Polyethylene Bitumen Tape offers an efficient and cost-effective solution.
Features
1, this product is solvent-free environmental protection products, that is, the base band and styling glue do not contain any volatile solvents, safe, fire and effectively protect the environment and the health of construction personnel.
2, the cold-wrapped tape substrate selection of polypropylene non-woven felt, the material is a new type of synthetic fiber with high mechanical strength and good corrosion resistance, and the surface does not contain wax, uniform thickness, so the surface of the anti-corrosion layer is flat, tight bonding, less pinholes, electrical properties and anti-corrosion properties are excellent.
3, the glue is solvent-free fast drying formula, the anti-corrosion layer curing speed is fast, and according to the season is divided into normal temperature type, low temperature type and ultra-low temperature type two, so it can be normal construction throughout the year, alleviating the winter construction problems.
4, the construction is convenient and fast, a wound can reach the China oil and gas industry standard SY/T 0447-96 requirements of the strengthening grade or extra strengthening grade anticorrosion layer required by the thickness and electric spark leak detection voltage, than the original use of epoxy coal tar paint and glass cloth combined into the same anticorrosion layer, convenient and fast.
5, the cold wrapping of epoxy coal asphalt makes the construction of epoxy coal asphalt anti-corrosion layer enter the factory pre-processing, effectively improve the construction quality and speed, and open up the scope of use for this kind of epoxy coal asphalt anti-corrosion layer with low price, long life and excellent anti-corrosion performance.
Properties
Physical Properties |
Test Method |
Typical Value |
English |
Metric |
Total thickness |
ASTM D 1000 |
50.0 mil |
1.27 mm |
Width |
- |
2''- 32 '' |
50 -800 mm |
Length |
- |
33' -200 ' |
10 -60 m |
Backing colour |
- |
Black,Yellow or others |
Tensile strength |
ASTM D 1000 |
55 N/cm |
Peel Adhesion to primed steel pipe |
ASTM D 1000 |
35 N/cm |
Elognation |
ASTM D 1000 |
400% |
Cathodic Disbandment |
ASTM G8 |
0.25 in radius 6.4 mm |
Dielectric Strength |
ASTM D 149 |
42 Kv |
Volume Resistivity |
ASTM D 1000 |
1.2x1012 ohm.cm |
Water Absorptivity |
ASTM D 570 |
0.1 % |
Water Vapor Transmission Rate (24h) |
ASTM F1249 |
0.1g/100sq mm/24h |
UV resistance |
|
Excellent |
Application Temperature |
|
23ºF-140ºF |
-5 ºC - 60 ºC |
Max Service Temperature |
|
-4ºF-176ºF |
- 20 ºC - 80ºC |
Width: 50mm,75mm,100mm,150mm;can be customized!
Length: 5m,10m,20m;can be customized!
1. Surface treatment. It is recommended to use shot blasting or sand blasting to remove rust at least GB/T 8923 Sa 2 level, it is recommended to reach Sa 2 1/2 level. When the construction conditions are limited, the rust can also be removed by hand or power tools to St 3 level. After the steel surface treatment is qualified, it must be painted as soon as possible before returning to rust. The surface of the concrete should be dry (surface water content is less than 6%), remove the loose material on the surface, and present a flat and solid surface.
2, with styling glue. Mix component A and B separately, and then mix thoroughly according to component A: Component B = 1:1 (weight ratio), and use immediately. The use of fast drying curing agent, curing speed is fast but the use period is short, so the summer must be used up within 1h, winter should be used up within 2h. Construction should be used now, so as not to cause solidification in the batching bucket, can not be used. When the ambient temperature is above 5 ° C during construction, normal temperature setting glue should be used (it should not be used below 5 ° C, because the curing time after coating is too long, affecting the construction progress), the ambient temperature is below 5 ° C, low temperature setting glue should be used (above 5 ° C can not be used, otherwise the curing speed is too fast, the good setting glue is easy to solidify in the barrel, can not be used, and the coating surface is prone to bubbles. Affect the quality).
3, weld putty. If the weld height is 2mm higher than the surface of the steel pipe and the special case of the lap of two steel plates, the two sides of the weld and the lap of the steel plate should be putty to form a smooth transition surface, and the pit on the concrete surface should also be putty to smooth. The putty is made of good styling glue and about twice the weight of talc powder, which should be used now, and used up within 2h after adjustment.
4. Glue and wrap. Before gluing, the steel surface must be dry, the amount of gluing is required to be sufficient, no leakage of coating, immediately after gluing, wrap the base band, the lap width of 10-20mm, must be pulled tight, so that the contact is tight, the surface is flat and no bulge, part of the adhesive liquid oozes from the surface of the tape (otherwise it indicates that the amount of gluing is insufficient), immediately after the wrapping on the tape and then evenly brush a layer of setting glue. After the end of work every day, we can use the diluent cleaning and brushing tools supplied by our company. After the diluent is used, the debris can be filtered out. It can be used again, but it must be kept closed.
Note: This product is divided into enhanced grades; Extra reinforcement grade; Three kinds of special intensification grade, in the choice of different levels of anti-corrosion requirements, the company is equipped with different adhesive and cold wrap. If you need to achieve the extra strengthening grade 0.8mm thick, you need to apply several sets of adhesive on the surface, instead of wrapping several cold tape, because 0.8mm thick cold tape can not penetrate the thick adhesive, so 0.8mm thick cold tape overlap must also be coated with adhesive.
(Note: Due to the low temperature, the consistency of the adhesive is relatively large, so it should be heated or used with diluent during construction, but if the diluent is added to reduce the solid content of the adhesive, it should be brushed several times or the thickness can not meet the requirements) The curing time of this product will depend on the length of the curing time when the temperature is low in winter, and the curing time is generally about 4 days in the case of zero degree.
5. Leak detection and repair. After the anti-corrosion layer is wrapped, let it dry itself, and keep it free from rain and water for at least 8h. After the anticorrosive layer is dried, the electric spark leak detector shall be used according to the leak detection voltage stipulated in China oil and gas industry standard SY/T 0447-96, that is: Use 2500V for the strengthening grade (0.4mm), 3000V for the extra strengthening grade (0.6mm), and 5000V for the extra strengthening grade (0.8mm) to check a small number of pinholes caused by uneven coating or missing coating, and mark the pinholes with chalk circles and apply the fixing glue as soon as possible. If it is required to use a higher leak detection voltage for the anti-corrosion layer, 1 to 2 layers of setting glue or epoxy coal asphalt topcoat can be applied after the anti-corrosion layer is dried.
6. Quality inspection. Inspection of appearance, thickness, leakage point and bonding force according to the conditions and methods specified in SY/T 0447-96.
1, must use our company supplied baseband, styling glue (including A, B components).
2, the number of rubber in each box is only the normal amount of rubber/baseband/rubber standard structure construction.
3, transport should be light loading and unloading, the carton is placed, to prevent rain, avoid sunlight exposure.
4, storage should keep the original packaging, stored in a cool, dry, ventilated, near the fire source of the warehouse, up to 4 layers, storage period of half a year.
Company profile
Huaian Construction New Material CO., LTD is a leading manufacturer specialized in industrial materials.
We focus on structural reinforcement, leakage repair, and corrosion prevention for industrial pipelines, and also provide waterproofing solutions for buildings.
Our product range includes:
Waterproof Materials: A variety of waterproof membranes, coatings, and related materials. They are non - toxic, suitable for various construction scenarios, and have a long service life.
Anticorrosive Materials: Such as different types of anticorrosive adhesive tapes, shrinkable sleeves, etc., crucial for protecting pipelines from corrosion.
Industrial Tapes: We produce various industrial tapes like masking tape, electrical tape, and protective and repair tapes for different industrial uses.
Insulation Blanket Products: Heat - insulation waterproof blankets and aluminum - insulation blankets for thermal insulation and waterproofing.
Our company is dedicated to offering high - quality, reliable, and eco - friendly materials to meet diverse customer needs.
We can provide real third-party inspection reports and maintain cooperation with many large engineering companies around the world.
FAQ
1. Manufactureror Trading Company
We are manufacturer, located in Jiangsu ,China
2. Trade Term
FOB, CIP, CIF, C&F, EXW, FCA
3. Minimum Order
The minimum order is 500 rolls.
4. Payment Terms
T/T (Telegraphic Transfer) , L/C at sight, Western Union
5. Estimated Time of Delivery
Based on order quantity:
Less than 5 tons, around 7-10 days.
5 - 10 tons, around 10-12 days
10- 20 tons, around 12 --15 days
More than 20 tons, depend on the agreement between two parties.
6. Free sample
The sample will be free , but the freight charge will be paid by buyer.
7. Logistics shipment
We can delivery the product by sea, truck, train, air, express delivery.
8. After-sales service.
1). Quality response
2). Providing technical proposal and field application training.