Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged

Product Details
Customization: Available
Certification: GS, RoHS, CE, ISO9001
Color: Black
Still deciding? Get samples of US$ 3/Piece
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (13)
  • Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged
  • Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged
  • Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged
  • Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged
  • Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged
  • Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged
Find Similar Products

Basic Info.

Model NO.
ZM-RP
Heat Resistance
High Temperature
Waterproof
Waterproof
Application
Plastic, Metal, Wood, Leather, Glass, Ceramic
Adhesive
Polyurethane
Base Material
Polyethylene
Type
Pressure-Sensitive Tape
Customize
Accept
OEM
Accpet
Features
Insulation, Anti-Corrosion, Anti-Corrosion Use out
Thickness
1.6-2.5mm
Size
250mm*250mm,Customize
Transport Package
Carton Sealing
Specification
Width can be customized; Length 25m
Trademark
ASN
Origin
Jiangsu, China
HS Code
3920109090
Production Capacity
60000pieces/Mouth

Product Description

Pipeline Repair Patch for Heat Shrinkable Sleeve DamagedPolyethylene Anti-corrosion   Pipeline Repair Patch
 

System  Description

 

Repair Patch cosists of an irradiated cross-linked polyolefin backing with hot melt adhesive layer.It is designed for sealing damaged pipe coatings. In combination with melt stick and epoxy primer most minor damages and cracks can be repaired effectively .It is compatible with most of the common pipeline coatings and suitable for operating temperatures up to 80ºC.

 

 

Product  Features

 

- Excellent multifunctional adhesive allow for lower installation pre-heat temperature and 

super bonding to PE, PP and FBE, offer fully resistant to shear forces induced by soil and thermal movements.

- Superior cathodic disbondment and hot water immersion resistance offers the optimum barrier long term protection against corrosion.
- Saves time & cost by lower preheat temperature, wet epoxy primer application.
- Pattern backing provides a "heating temperature indicator" for application of heat, ensures correct application heating.

Selectable Size
1.
100*100mm
2. 
150*150mm
3.
200*200mm
4.
in rolls
5.
customized size
Pipeline Repair Patch for Heat Shrinkable Sleeve DamagedPipeline Repair Patch for Heat Shrinkable Sleeve Damaged
Pipeline Repair Patch for Heat Shrinkable Sleeve DamagedPipeline Repair Patch for Heat Shrinkable Sleeve DamagedPipeline Repair Patch for Heat Shrinkable Sleeve Damaged
 
Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged

Huaian Construction New Material CO.,LTD is a supplier of structural reinforcement, leakage repair and Anticorrosion for industrial and industrial pipelines, and provides waterproof materials for swimming pools, floors and other buildings.Has 15 own patents and declares high-tech enterprises. And participates in many large foreign trade fairs every year. 

We are the waterproof,ANTI-CORROSION experts around you!
Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged
Pipeline Repair Patch for Heat Shrinkable Sleeve Damaged

Pipeline Repair Patch for Heat Shrinkable Sleeve DamagedPipeline Repair Patch for Heat Shrinkable Sleeve DamagedPipeline Repair Patch for Heat Shrinkable Sleeve DamagedPipeline Repair Patch for Heat Shrinkable Sleeve DamagedPipeline Repair Patch for Heat Shrinkable Sleeve DamagedFAQ:
1. Manufactureror Trading Company
We are manufacturer, located in Jiangsu ,China

2. Trade Term
FOB, CIP, CIF, C&F, EXW, FCA

 
3. Minimum Order
The minimum order is 3000 rolls.

 
4. Payment Terms
T/T (Telegraphic Transfer) , L/C at sight, Western Union

 
5. Estimated Time of Delivery
Based on order quantity:
Less than 5 tons, around 7-10 days.
5 - 10 tons, around 10-12 days
10- 20 tons, around 12 --15 days
More than 20 tons, depend on the agreement between two parties.

 
6. Free sample
The sample will be free , but the freight charge will be paid by buyer.

 
7. Logistics shipment
We can delivery the product by sea, truck, train, air, express delivery.

 
8. After-sales service.
1). Quality response
2). Providing technical proposal and field application training
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
Product Groups
More